Investigation of time impact on electrocoagulation process to treat ablution wastewater

نویسندگان

چکیده

Abstract The ablution ritual performed by Muslims before praying requires large amounts of clean water (3.9 L - 4.42 L/person). This is a challenge that needs to be addressed, as in some places, scarce commodity. study aims treat wastewater at Masjid Al-Bukhari UIN Raden Mas Said Surakarta using electrocoagulation. treated expected reused for rituals the mosque. Laboratory-scale research methods were wastewater. effect electrolysis time was evaluated determine efficiency method on parameters pH, temperature, total dissolved solid (TDS), conductivity, and ammonia level. Interestingly, electrocoagulation meets quality standards. means safe reuse activities mosques. has significant increase pH value decrease TDS levels decreased 65.3% when 40 min. Meanwhile, conductivity 526 µS/cm from initial 1108 60 Statistically, TDS, (α<0.05).

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization of electrocoagulation process to treat grey wastewater in batch mode using response surface methodology

BACKGROUND Discharge of grey wastewater into the ecological system causes the negative impact effect on receiving water bodies. METHODS In this present study, electrocoagulation process (EC) was investigated to treat grey wastewater under different operating conditions such as initial pH (4-8), current density (10-30 mA/cm2), electrode distance (4-6 cm) and electrolysis time (5-25 min) by usi...

متن کامل

Correction to: Investigation of Electrocoagulation Process Performance with DC Current in Treatment of Poultry Slaughterhouse Wastewater Using Aluminum Electrodes

Correction to: Investigation of Electrocoagulation Process Performance with DC Current in Treatment of Poultry Slaughterhouse Wastewater Using Aluminum Electrodes     Zabiholllah Yousefi1, Hossein Sahebian2, Abdoliman Amouei3, Reza Ali Mohammadpour4, Ebrahim Zarei5   1 Professor, Department of Environmental Health Engineering, Faculty of Health, Mazandaran University of Medical Science...

متن کامل

an investigation of the impact of self monitoring on langauge teachers motivational practice and its effect on learners motivation

the central purpose of this study was to conduct a case study about the role of self monitoring in teacher’s use of motivational strategies. furthermore it focused on how these strategies affected students’ motivational behavior. although many studies have been done to investigate teachers’ motivational strategies use (cheng & d?rnyei, 2007; d?rnyei & csizer, 1998; green, 2001, guilloteaux & d?...

the impact of portfolio assessment on iranian efl students essay writing: a process-oriented approach

this study was conducted to investigate the impact of portfolio assessment as a process-oriented assessment mechanism on iranian efl students’ english writing and its subskills of focus, elaboration, organization, conventions, and vocabulary. out of ninety juniors majoring in english literature and translation at the university of isfahan, sixty one of them who were at the same level of writing...

15 صفحه اول

Textile Wastewater Conductivity Control of Electrocoagulation Process Using Matlab / Simulink

This paper presents an experimental application of PID control to study the electrocoagulation process of textile wastewater. The addition of NaCl solution would also lead to the decrease in power consumption because of the increase in conductivity. Conductivity in electrocoagulation process is difficult to control because of the complex nonlinear behaviour involved. Conductivity changes during...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2022

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/1098/1/012047