Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling

نویسندگان

چکیده

This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure a high-level system for exact optimization PMT was created. To ensure data compatibility between automate process obtaining schedule, transformation (DTT) developed within spreadsheet application. The suggested can determine: (i) an optimal schedule with associated network diagram Gantt chart in continuous or discrete time units; (ii) critical non-critical activities, including their early start, late finish, finish along total free slack times; (iii) minimum cost allocation direct indirect costs. provides functionalities such as: MINLP be updated, schedules re-optimized; saved as baseline track changes; different algorithms engaged whereby switching them does not require model (iv) used task completion optimized schedule; (v) calendar settings changed; (vi) visual reports generated efficient management. Results scheduling are given conventional environment, which raises possibility that proposed will more widely practice. Integration allows each software what it initially designed. Their combination leads additional information features would significantly difficult achieve if separately. Application examples show advantages approach.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CS 524 Project : StarCraft Mixed Integer Program

StarCraft is a real-time strategy PC game released by Blizzard Entertainment in 1998. It is widely regarded as the defining game of the genre, receiving broad critical acclaim and many years of commercial success. The game retains a large and loyal fanbase and is a popular e-sport, especially in Korea. StarCraft also contributes to artificial intelligence research, serving as a testbed for agen...

متن کامل

A mixed-integer nonlinear program for the optimal design and dispatch of distributed generation systems

Maturing distributed generation (DG) technologies have promoted interest in alternative sources of energy for commercial building applications due to their potential to supply on-site heat and power at a lower cost and emissions rate compared to centralized generation. Accordingly, we present an optimization model that determines the mix, capacity, and operational schedule of DG technologies th...

متن کامل

Global Supply Chain Management under Carbon Emission Trading Program Using Mixed Integer Programming and Genetic Algorithm

In this paper, the transportation problem under the carbon emission trading program ismodelled by mathematical programming and genetic algorithm. Since green supply chain issuesbecome important and new legislations are taken into account, carbon emissions costs are included inthe total costs of the supply chain. The optimisation model has the ability to minimise the total costsand provides the ...

متن کامل

Repetitive construction processes scheduling using mixed-integer linear programming

Many construction projects contain several identical or similar units, such as floors in multistory buildings, houses in housing developments, sections of pipelines or highways. Repetitive processes arise from the subdivision of a generalized construction process into specific activities associated with particular units. In many cases it is possible to perform individual processes (repeated in ...

متن کامل

construction and validation of translation metacognitive strategy questionnaire and its application to translation quality

like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su132112173