Integrated Maintenance-Quality strategies with reworking activities

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system

Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...

متن کامل

Preventive maintenance models with random maintenance quality

In real-world environments it is usually difficult to specify the quality of a preventive maintenance (PM) action precisely. This uncertainty makes it problematic to optimise maintenance policy. This problem is tackled in this paper by assuming that the quality of a PM action is a random variable following a probability distribution. Two frequently studied PM models, a failure rate PM model and...

متن کامل

Integrated maintenance and control policy based on quality control

In this paper, we develop a joint quality control and preventive maintenance policy for a production system producing conforming and non-conforming units. The considered system consists of one machine which must supply another production line operating on a just-in-time basis. According to the proportion l of non-conforming units observed on each lot and compared to a threshold value lm, one de...

متن کامل

An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities

Article history: Received 19 April 2014 Received in revised form 7 January 2015 Accepted 11 February 2015 Available online 2 March 2015

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2016

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2016.11.011