Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System

A customer order to a multi-item inventory system typically consists of several different items in different amounts. The probability of satisfying an arbitrary demand within a prespecified time window, termed the order fill rate, is an important measure of customer satisfaction in industry. This measure, however, has received little attention in the inventory literature, partly because its eva...

متن کامل

Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework

This study is concerned with the optimal common cycle time for a multi-item production system with discontinuous delivery and failure in rework. In real life manufacturing environments, managements often plan to produce multiple products in turn on a single machine in order to maximize machine utilization. Also, dealing with random defective items during production seems to be an inevitable tas...

متن کامل

Production and Inventory Control of a Multi-item Multi-stage Manufacturing System: Simulation Modeling, Capacitated Shipment Planning and Kanban Design

The project work presented in this thesis has proposed solutions related to the control of production and work-in-process inventory in a multi-item multi-stage manufacturing system. A suitable base-stock inventory control policy is recommended to ensure that the desired service levels are maintained between production stages and for the final customers. Concept of coupling the production lines ...

متن کامل

Manufacturing and Shipment Policy Making for an Integrated System with Rework and a Cost Lessening Product Delivery Plan

This paper derives the optimal production-shipment policy for a vendor-buyer integrated system with rework process and a cost lessening product delivery plan. The objective is to derive the optimal production lot size and number of deliveries that minimizes total costs for the proposed vendor-buyer integrated system. This paper extends the work of Chiu et al. [Joint determination of the product...

متن کامل

a multi-product inventory control model with imperfect production process and rework under delayed payment policy

the traditional economic production quantity (epq) model assumes that during the production process no imperfect item is produced. but in the real production system, due to imperfect production process or other factors, imperfect quality items may be produced. furthermore, it is well-known that the total production-inventory costs can be reduced by reworking the imperfect quality items produced...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research Perspectives

سال: 2019

ISSN: 2214-7160

DOI: 10.1016/j.orp.2019.100115