منابع مشابه
Case Studies for Improving FMS Scheduling by Lot Streaming in Flow-Shop Systems
This paper deals with scheduling problems of the Flexible manufacturing systems (FMS). The objective is to improve the utilization of FMS. Lot Streaming (LS) is used to meet this objective. In this paper a comparative study is performed between the applications of new methods: Brute Force method (BFM) and Joinable Schedule Approach (JSA). Case studies for Flow Shop Systems (FSS) are performed. ...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملmodelling and scheduling lot streaming flexible flow lines
although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. this paper deals with scheduling jobs in lot streaming flexible flow line problems. the paper mathematically formulates the problem by a mixed integer linear programming model. this model solves small instances to optimality. moreo...
متن کاملLot Streaming in Hybrid Flow Shop Scheduling
Production planning and scheduling play significant roles in manufacturing system operations and different techniques have been used to enhance their performance. Lot streaming has been studied for decades and is shown to accelerate production flow. This research deals with lot streaming in hybrid flow shops. Multiple products are processed in a multi-stage hybrid flow shop with non-identical m...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Periodica Polytechnica Mechanical Engineering
سال: 2007
ISSN: 0324-6051,1587-379X
DOI: 10.3311/pp.me.2007-1.01