Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags
نویسندگان
چکیده
منابع مشابه
IIR System Identification Using Improved Harmony Search Algorithm with Chaos
Due to the fact that the error surface of adaptive infinite impulse response (IIR) systems is generally nonlinear and multimodal, the conventional derivative based techniques fail when used in adaptive identification of such systems. In this case, global optimization techniques are required in order to avoid the local minima. Harmony search (HS), a musical inspired metaheuristic, is a recently ...
متن کاملAn improved adaptive binary Harmony Search algorithm
Article history: Received 3 September 2011 Received in revised form 9 December 2012 Accepted 31 December 2012 Available online 16 January 2013
متن کاملthe algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولiir system identification using improved harmony search algorithm with chaos
due to the fact that the error surface of adaptive infinite impulse response (iir) systems is generally nonlinear and multimodal, the conventional derivative based techniques fail when used in adaptive identification of such systems. in this case, global optimization techniques are required in order to avoid the local minima. harmony search (hs), a musical inspired metaheuristic, is a recently ...
متن کاملThe Resource Leveling Problem with Multiple Resources Using an Adaptive Genetic Algorithm
Resources management ensures that a project is completed on time and at cost, and that its quality is as previously defined; nevertheless, resources are scarce and their use in the activities of the project leads to conflicts in the schedule. Resource leveling problems consider how to make the resource consumption as efficient as possible. This paper presents a new Adaptive Genetic Algorithm fo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Automation in Construction
سال: 2017
ISSN: 0926-5805
DOI: 10.1016/j.autcon.2017.01.018