Identifying Rock Loads on TBM Shields During Standstills (Non-Advance-Periods)
نویسندگان
چکیده
Abstract Tunnel boring machine (TBM) operational data is mostly analysed with respect to that was recorded during the advance of TBM. Focusing on standstills a gripper TBM, we analyse rock loads were passively in cylinders small roof support shield. These are situated beneath TBM’s shield – extending it against mass non-advance periods. Equipped pressure sensors, they enable unique opportunity logging load variations throughout tunnel. Hence due big amount resulting data, techniques unsupervised learning (i.e. cluster analysis) used automatically pre-process TBM data. Furthermore, regression analysis determine sections tunnel where mainly occurring left or right side respectively. The driven shows main which good accordance observation from construction site, as well numerical models literature. This paper contributes towards understanding conditions anisotropic masses drive deep hard
منابع مشابه
Prediction of hard rock TBM penetration rate based on Data Mining techniques
The aim of this work is to use Data Mining tools to develop models for the prediction of hard rock tunnel boring machine (TBM) penetration rate (ROP). A database published by Yagiz (2008) was used to develop these models. The parameters of the database were the uniaxial compressive strength (UCS), an index used to quantify the brittleness and toughness and denominated peak slope index (PSI), th...
متن کاملTBM Performance Prediction in Rock Tunneling Using Various Artificial Intelligence Algorithms
With widespread increasing applications of mechanized tunneling in almost all ground conditions, prediction of tunnel boring machine (TBM) performance is required for time planning, cost control and choice of excavation method in order to make tunneling economical. Penetration rate is a principal measure of full-face TBM performance and is used to evaluate the feasibility of the machine and pre...
متن کاملSpinal Loads during Cycling on an Ergometer
Cycling on an ergometer is an effective exercise for improving fitness. However, people with back problems or previous spinal surgery are often not aware of whether cycling could be harmful for them. To date, little information exists about spinal loads during cycling. A telemeterized vertebral body replacement allows in vivo measurement of implant loads during the activities of daily living. F...
متن کاملNumerical Analysis of Dynamic Response Mechanism of Rock by TBM Disc Cutter
The dynamic response mechanism of the rock fragmentation and its influential factors by TBM disc cutter are studied in this paper. Firstly, a dynamic response model is established based on the fracture mechanics and finite element theory. Secondly, a fragmentation rule is founded according to the dynamic response model, and then numerical simulations for dynamic response of rock are carried out...
متن کاملRecent Developments in Site Investigation and Testing for Hard Rock Tbm Projects
For several recent TBM tunnel projects, unexpected ground conditions have been encountered, causing extra cost, considerable delay, and in some cases major claims. Undoubtedly, insufficient and/or irrelevant site investigation and testing are among the main causes of such incidents. The purpose of this paper is to review the main investigations and tests relevant for hard rock TBM projects, wit...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Geotechnical and Geological Engineering
سال: 2022
ISSN: ['0960-3182', '1573-1529']
DOI: https://doi.org/10.1007/s10706-022-02263-x