Identification of Quantity Surveyor Competency Risk for Cost Overrun
نویسندگان
چکیده
Appropriateness of costs in the process building a high-rise is one success criteria for construction project. However, main problem that often faced by most projects related to occurrence cost overruns. Quantity Surveyor has an important role According IQSI, consists 4 scopes, namely planning and controlling costs, documenting completeness tender documents, contract administration, arbitration. This study aims identify risk factors ratings from competency have potential cause The method used this Delphi method, validate risks obtained literature study. From results analysis, 52 variables with moderate level were obtained, 3 high pre-construction stages which could
منابع مشابه
Managing Cost Overrun Risk in Project Funding Allocation
This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...
متن کاملconditional copula-garch methods for value at risk of portfolio: the case of tehran stock exchange market
ارزش در معرض ریسک یکی از مهمترین معیارهای اندازه گیری ریسک در بنگاه های اقتصادی می باشد. برآورد دقیق ارزش در معرض ریسک موضوع بسیارمهمی می باشد و انحراف از آن می تواند موجب ورشکستگی و یا عدم تخصیص بهینه منابع یک بنگاه گردد. هدف اصلی این مطالعه بررسی کارایی روش copula-garch شرطی در برآورد ارزش در معرض ریسک پرتفویی متشکل از دو سهام می باشد و ارزش در معرض ریسک بدست آمده با روشهای سنتی برآورد ارزش د...
Project Cost Overrun Simulation in Software Product Line Development
The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned ...
متن کامل“the effect of risk aversion on the demand for life insurance: the case of iranian life insurance market”
abstract: about 60% of total premium of insurance industry is pertained?to life policies in the world; while the life insurance total premium in iran is less than 6% of total premium in insurance industry in 2008 (sigma, no 3/2009). among the reasons that discourage the life insurance industry is the problem of adverse selection. adverse selection theory describes a situation where the inf...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Devotion
سال: 2023
ISSN: ['2797-6068', '2777-0915']
DOI: https://doi.org/10.59188/devotion.v4i9.531