Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Robust Solutions for the Resource-Constrained Project Scheduling Problem

Robustness is essential for schedules if they are being executed under uncertain conditions. In this thesis we research robustness in Partial Order Schedules, which represent sets of solutions for instances of the Resource-Constrained Project Scheduling Problem. They can be generated using a greedy procedure called Chaining, which can be easily adapted to use various heuristics. We use an empir...

متن کامل

A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem

In this paper, we propose a particle swarm optimization (PSO) based hyper-heuristic algorithm for solving the resource constrained project scheduling problem (RCPSP). To the best of our knowledge, this is the first attempt to develop a PSO hyper-heuristic and apply to the classic RCPSP. The hyper-heuristic works as an upper-level algorithm that controls several low-level heuristics which operat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2020

ISSN: 2169-3536

DOI: 10.1109/access.2020.3013375