Group Technology Scheduling with Due-Date Assignment and Controllable Processing Times
نویسندگان
چکیده
This paper investigates common (slack) due-date assignment single-machine scheduling with controllable processing times within a group technology environment. Under linear and convex resource allocation functions, the cost function minimizes (including weighted sum of earliness, tardiness, assignment, where weights are position-dependent) resource-allocation costs. Given some optimal properties problem, if size jobs in each is identical, sequence can be obtained via an problem. We then illustrate that problem polynomially solvable O(℘3) time, ℘ number jobs.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملIntegrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and...
متن کاملScheduling with Controllable Processing Times
In today's industrial world, demand nature is changing where the customers are looking for a high variety of products. In order to meet varying customer demands, the firms should be flexible enough to produce parts in an efficient way. The flexible manufacturing systems have emerged with the progress in manufacturing technology. A flexible manufacturing system (FMS) is a computer-controlled pro...
متن کاملThe single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
We study the earliness-tardiness scheduling problem on a single machine with due date assignment and controllable processing times. We analyze the problem with three different due date assignment methods and two different processing time functions. For each combination of these, we provide a polynomialtime algorithm to find the optimal job sequence, due date values and resource allocation minim...
متن کاملDue-Window Assignment Scheduling with Variable Job Processing Times
We consider a common due-window assignment scheduling problem jobs with variable job processing times on a single machine, where the processing time of a job is a function of its position in a sequence (i.e., learning effect) or its starting time (i.e., deteriorating effect). The problem is to determine the optimal due-windows, and the processing sequence simultaneously to minimize a cost funct...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Processes
سال: 2023
ISSN: ['2227-9717']
DOI: https://doi.org/10.3390/pr11041271