Group Elevator Peak Scheduling Based on Robust Optimization Model
نویسندگان
چکیده
منابع مشابه
Decision-Theoretic Group Elevator Scheduling
We present an efficient algorithm for exact calculation and minimization of expected waiting times of all passengers using a bank of elevators. The dynamics of the system are represented by a discrete-state Markov chain embedded in the continuous phase-space diagram of a moving elevator car. The chain is evaluated efficiently using dynamic programming to compute measures of future system perfor...
متن کاملRisk-Averse Group Elevator Scheduling
We introduce a novel group elevator scheduler based on an explicit decision-theoretic calculation for the expectation of any polynomial function of passengers’ waiting times, marginalized over sources of uncertainty in the system state. The same framework can be used to identify risky assignments that have low expected costs but may cause some individuals to be ”stranded” with excessive waits f...
متن کاملmortality forecasting based on lee-carter model
over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...
15 صفحه اولSubmodular Function Maximization for Group Elevator Scheduling
We propose a novel approach for group elevator scheduling by formulating it as the maximization of submodular function under a matroid constraint. In particular, we propose to model the total waiting time of passengers using a quadratic Boolean function. The unary and pairwise terms in the function denote the waiting time for single and pairwise allocation of passengers to elevators, respective...
متن کاملMultiobjective Optimization in Elevator Group Control
Modern elevator systems in high-rise buildings consist of groups of elevators with centralized control. The group control allocates hall calls to the most suitable elevators by optimizing a cost function. This problem can be viewed as a combination of online scheduling, resource allocation, and stochastic control. The usual performance criterion to be optimized when scheduling passenger pick-up...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Electrical and Computer Engineering
سال: 2013
ISSN: 1582-7445,1844-7600
DOI: 10.4316/aece.2013.03009