GEOTECHNICAL MONITORING DURING CONSTRUCTION IN DIFFICULT SOIL CONDITIONS
نویسندگان
چکیده
One of the common and at same time most difficult problems that developers may face is unstable soil layer base a future building. This paper describes construction on weak, subsidence heaving soils in engineering geological conditions Kursk city. Real problem property safety shown with example one demanding geomorphological lithological urban areas. The offers description geologic hydrogeological features slope rock mass right bank Tuskar river. Groundwater level lies 8.7 m. depth. It possible to predict an increase groundwater building maintenance because this area potentially flooded. Various processes such phenomena as ground subsidence, karst, suffosia, landslides, flooding, etc., can also be found studied territory. Initially insufficient engineering-geomorphological, hydrogeological, ecological engineering-geological study hazardous areas city have led its problematic development, which illustrates situation residential real estate To dangerous ensure reliability fund, specific proposals been developed for organization geotechnical monitoring system based optimal integration geomorphological, geodesic, engineering-geological, environmental methods complex conditions.
منابع مشابه
ASCE Geotechnical and Construction
The Jackson Lake Dam was constructed in 1917 in the Grand Teton National Park near Jackson, Wyoming. The dam was a hydraulic fill placed on a natural alluvium and outwash foundation. The Bureau of Reclamation (Burec) determined that the dam and its foundation would be susceptible to liquefaction and failure during a potential earthquake; a series of contracts was let to remove and replace the d...
متن کاملGeotechnical Instruments in Structural Monitoring
Geotechnical instruments are used widely as a complementary tool to geodetic methods in monitoring natural and man-made structures. This paper provides an overview of geotechnical instruments used in structural monitoring. The transducers commonly used in geotechnical instrumentation are first introduced. This is followed by an introduction of the various types of instruments including their wo...
متن کاملTunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study
The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great complexity in an area high potential for sliding and water-bearing fault which has made the excavati...
متن کاملSurvey and geotechnical slope monitoring considerations
Monitoring of the slopes of surface mines can prevent loss of life, equipment, production and possibly the loss of the mine. The effectiveness of such monitoring depends on the extent to which slopes give adequate advanced warning before failing, and on the ability of the monitoring system to detect such warning. There is considerable evidence (for example, Ding et al., 1998) to indicate that s...
متن کاملcomprehension monitoring in l1&l2
هدف اصلی این تحقیق مقایسه و تمایز بین روشها و استراتژیهای خاص برای درک مطلب بهتر در زبان مادری و زبان دوم بوده است. در قدم اول میزان توانایی افراد در درک مطلب فارسی و انگلیسی اندازه گیری و سپس رده بندی شد. همچنین از دانش آموزان خواسته شد که در مورد روشها و استراتژیهایی که برای درک مطلب بهتر به کار برده بودند توضیح دهند. نتیجه این مرحله از تحقیق نشان داد که دانشجویان برای درک مطلب مطلوب در زبان ...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Istraživanja i projektovanja za privredu
سال: 2021
ISSN: ['1821-3197', '1451-4117']
DOI: https://doi.org/10.5937/jaes0-31438