Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling
نویسندگان
چکیده
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملAn Approach to Resource Constrained Project Scheduling
This paper gives an overview of a new approach to Resource Constrained Project Scheduling. The approach is based on the combination of a novel optimization technique with limited discrepancy search, and generates the best known solutions to benchmark problems of realistic size and character.
متن کاملStochastic Resource-constrained Project Scheduling
PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...
متن کاملSpatial Resource Constrained Project Scheduling
In this paper, we present a new topic in connection with project scheduling. Since a limited work space can form a restriction to project scheduling problems, an efficient usage of these work spaces (or so-called spatial resources) is required to produce good project schedules. The requirement for the resource units of these spatial resources is in an adjacent manner (we cannot place a product ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2020
ISSN: 2071-1050
DOI: 10.3390/su12218918