Flexible Job Shop Problem with Variable Machine Flexibility
نویسندگان
چکیده
منابع مشابه
Flexible job-shop scheduling with parallel variable neighborhood search algorithm
Flexible job-shop scheduling problem (FJSP) is an extension of the classical job-shop scheduling problem. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the machines. This paper proposes a parallel variable neighborhood search (PVNS)...
متن کاملCritical Path Method for Flexible Job Shop Scheduling Problem with Preemption
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...
متن کاملSolving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملGenetic tabu search for the fuzzy flexible job shop problem
This paper tackles the flexible job-shop scheduling problem with uncertain processing times. The uncertainty in processing times is represented by means of fuzzy numbers, hence the name fuzzy flexible job-shop scheduling. We propose an effective genetic algorithm hybridised with tabu search and heuristic seeding to minimise the total time needed to complete all jobs, known as makespan. To build...
متن کاملTabu Search for the Flexible-Routing Job Shop Problem
In the classical job shop scheduling problem (JSSP), n jobs are processed to completion on m unrelated machines. Each job requires processing on each machine exactly once. For each job, technology constraints specify a complete, distinct routing which is fixed and known in advance. Processing times are sequence-independent, fixed, and known in advance. Each machine is continuously available fro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2019
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2019.10.009