FASTBUS readout system for the CDF DAQ upgrade

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

BIF Profile Monitor for the UNILAC - Tests and DAQ Upgrade

The non-intercepting Beam Induced Fluorescence (BIF) monitor for transverse beam profile measurements was successfully tested for different ion species and energies from 5 to 750 MeV/u at the GSI accelerators [1]. Starting from its first implementation [2] we systematically investigated technical aspects such as the proper choice of optics and gain factors, as well as physical aspects like the ...

متن کامل

The CDF L2 Track Trigger Upgrade

Since 2001 the CDF II detector has been collecting data used to carry out a rich physics program at the Fermilab Tevatron pp̄ collider. The quality and purity of the data relies heavily on the high performance and efficiency of the CDF trigger system. The online trigger most heavily relied on for physics analyses is the eXtremely Fast Tracker (XFT), a track trigger system used to identify charge...

متن کامل

Proposed STAR Time of Flight Readout Electronics and DAQ

The Time-of-Flight system is a proposed addition to the STAR detector currently installed at RHIC. The proposal is based on a new technology called the Multi-gap Resistive Plate Chamber (MRPC), and consists of approximately 23,000 channels of detectors distributed over 120 trays. Each TOF tray consists of 192 detector channels and three different types of electronic circuit cards, called “TFEE”...

متن کامل

Run IIb Upgrade for CDF L2 Decision Crate

We describe an upgrade for CDF’s L2 decision crate for Run IIb. The system is based on the Pulsar board currently under construction for the L2 test stand. The goal of the system is to have a high data bandwidth and, at the same time, to be highly modular, maintainable and flexible, and to use off-the-shelf hardware whenever possible. The modularity is achieved by building a universal interface...

متن کامل

B Physics with the CDF Run II Upgrade

During the Run I data taking period, from 1992 through 1995, CDF has acquired 110 pb of pp̄ collisions at a center of mass energy of 1800 GeV. This data has provided many results on B physics [1], and provides a basis for extrapolating to Run II, which is scheduled to start in 1999 after major upgrades to both the accelerator and detector. We present herein a summary of Run I results relevant to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Nuclear Science

سال: 1994

ISSN: 0018-9499,1558-1578

DOI: 10.1109/23.322903