Factors for Time and Cost Overrun in Public Projects
نویسندگان
چکیده
منابع مشابه
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...
متن کاملa framework for identifying and prioritizing factors affecting customers’ online shopping behavior in iran
the purpose of this study is identifying effective factors which make customers shop online in iran and investigating the importance of discovered factors in online customers’ decision. in the identifying phase, to discover the factors affecting online shopping behavior of customers in iran, the derived reference model summarizing antecedents of online shopping proposed by change et al. was us...
15 صفحه اولAnalysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کاملproficiency level and factors fostering reticence in efl learners
according to cheng (1999), in recent esl/efl literature, asian (especially east asian) learners of english as a foreign/second language have been arguably reported as reticent and passive learners. the most common allegations are that these students are reluctant to participate in classroom discourse; they are unwilling to give responses; they do not ask questions; and they are passive and over...
15 صفحه اولFactors Causing Project Cost Overrun in the Telecommunications Industry in Oman
Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Engineering, Project, and Production Management
سال: 2021
ISSN: 2223-8379
DOI: 10.2478/jeppm-2021-0023