Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules
نویسندگان
چکیده
منابع مشابه
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability
In this paper, an integrated machine scheduling withits due date setting problem has been considered. It is assumed that the machine is subject to some kind of random unavailability. Due dates should be set in an attractive and reliable manner, implying that they should be short and possible to be met. To this end, first, long due dates are penalized in the objective function. Then, for each cu...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملan investigation into iranian teachers consistency and bias in evaluation of students writings
while performance-based language assessment has led to an increased authenticity and content validity in the practice of writing assessment, the reliability of ratings has become a major issue. research findings have shown different reactions by native english speaker (nes) and non-native english speaker (nns) teachers to students’ writings. the focus of this study is on investigating whether i...
An efficient meta-heuristic for the single machine common due date scheduling problem
A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...
متن کاملDue-date assignment and parallel-machine scheduling with deteriorating jobs
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job’s processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuris...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Flexible Manufacturing Systems
سال: 1993
ISSN: 0920-6299,1572-9370
DOI: 10.1007/bf01325033