Economic criteria to select a cost‐effective maintenance policy

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Preventive Maintenance Decision Policy Based on Economic-Technical and Applicibility Considerations

The present study is intended to develop a Preventive Maintenance (PM) policy for industrial applications, while considering two different objectives: the first objective is to optimize the total maintenance costs, i.e., the Preventive Maintenance (PM) and Emergency Maintenance (EM) Costs Per Unit Time. (CPUT). The second objective is to design the policy in such a way that the simplicity of it...

متن کامل

A Preventive Maintenance Decision Policy Based on Economic-Technical and Applicibility Considerations

The present study is intended to develop a Preventive Maintenance (PM) policy for industrial applications, while considering two different objectives: the first objective is to optimize the total maintenance costs, i.e., the Preventive Maintenance (PM) and Emergency Maintenance (EM) Costs Per Unit Time. (CPUT). The second objective is to design the policy in such a way that the simplicity of it...

متن کامل

A Multi-criteria Approach to Select Suppliers Based on Performance

Selecting suppliers is a multi-criteria decision-making problem involving both qualitative and quantitative factors. The aim of this paper is to propose a multi-criteria approach that aids to select suppliers based on two interrelated inputs: overall system performance and supplier performance. With this model, enterprises that are collaborating will have a tool to select suppliers not only bas...

متن کامل

a preventive maintenance decision policy based on economic-technical and applicibility considerations

the present study is intended to develop a preventive maintenance (pm) policy for industrial applications, while considering two different objectives: the first objective is to optimize the total maintenance costs, i.e., the preventive maintenance (pm) and emergency maintenance (em) costs per unit time. (cput). the second objective is to design the policy in such a way that the simplicity of it...

متن کامل

Structural Macroeconomic Capacity to a Reaction in Economic Policy Shocks : The Case of Iran

          The aim of this paper is to simulate the effects of some macroeconomic policy tools on production and inflation of Iran by the current worldwide financial and real crisis. The theoretical framework of the analysis is based on the so-called ‘IMF/World Bank Integrated Model’ which is the synthesis (a merger) of the basic monetary approach of the Balance of Payments used at t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Quality in Maintenance Engineering

سال: 1999

ISSN: 1355-2511

DOI: 10.1108/13552519910282692