Earthwork Planning and Visualisation of Time-Location Information in Road Construction Projects
نویسندگان
چکیده
منابع مشابه
A new approach for automation of location-based earthwork scheduling in road construction projects
a r t i c l e i n f o Accurate information of working locations is vital for efficient resource planning, safety of the construction site and monitoring the weekly progress of earthworks, which is missing in the existing linear scheduling methods. Construction managers have to depend on the subjective decisions for resources allocation and progress monitoring from location aspects. This has cau...
متن کاملAn innovative approach for generation of a time location plan in road construction projects
Existing linear scheduling methods for earthwork activities lack accurate scheduling locations in road construction projects. Project planners and construction managers largely depend on subjective decisions for the allocation of resources at correct locations. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. Accurate information o...
متن کاملOptimized Earthwork Planning Methodology for Land Development Projects
An earthwork for land development projects, which possesses around 20% of the total project cost, consists mainly of simply repetitive tasks such as loading, hauling, dumping, and returning and depends largely on heavy construction machines. The goal of earthwork planning is to minimize the project cost and duration by determining soil allocation, equipment configuration, and haul route. Due to...
متن کاملthe effects of time planning and task complexity on accuracy of narrative task performance
هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...
Visualization of Vehicular Traffic in Augmented Reality for Improved Planning and Analysis of Road Construction Projects
This paper describes research that investigated the application of 3D Augmented Reality (AR) for animating traffic simulation models in real time to support the planning and design of road construction projects. Traditional 3D visualization applications use Virtual Reality (VR) environments to visualize traffic simulations. The significant amount of time and human resources required to collect ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Advanced College of Engineering and Management
سال: 2016
ISSN: 2392-4853
DOI: 10.3126/jacem.v1i0.14924