Earned Value Management Application Issues and Consideration for Weapon System Development Project

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

Analysis and Application of Earned Value Management in Software Development

Earned Value Management (EVM) is a well-known cost and schedule management technique in government and defense industry projects. Its usage, however, is not as wide spread in the general software industry. In this paper we explore some of the shortcomings in EVM and suggest several improvements in the application of EVM in software development projects. In particular, we analyze the nature of s...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Korea Society of Systems Engineering

سال: 2015

ISSN: 1738-480X

DOI: 10.14248/jkosse.2015.11.1.041