EARNED VALUE ANALYSIS, IMPLEMENTATION BARRIERS, AND MATURITY LEVEL IN OIL & GAS PRODUCTION

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Organizational Earned Value Analysis

We offer an approach for performing organization earned value analysis by taking advantage of the hierarchical structure of the GQMStrategies grid. The merger enables us to create an integrated hierarchy of business goals, value goals, and strategies for achieving those goals and to monitor and evaluate those goals at all levels. It provides a means to expand the definition of earned value metr...

متن کامل

consequence analysis of the leakage, ignition and explosion during high pressure sour gas injection process to the oil reservoir

there is no doubt that human being needs to become integrated with industry and industry needs to be progressed, daily. on the other hand, serious events in industrial units specially in oil industries has been shown that such damages and events are industry related ones. the consequence of such events and damages which resulted in chemical and poisoned explosions and loss of life and property ...

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

Analysis and Application of Earned Value Management in Software Development

Earned Value Management (EVM) is a well-known cost and schedule management technique in government and defense industry projects. Its usage, however, is not as wide spread in the general software industry. In this paper we explore some of the shortcomings in EVM and suggest several improvements in the application of EVM in software development projects. In particular, we analyze the nature of s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: South African Journal of Industrial Engineering

سال: 2019

ISSN: 2224-7890

DOI: 10.7166/30-4-2030