Developing a Comprehensive Shipment Policy through Modified EPQ Model Considering Process Imperfections, Transportation Cost, and Backorders
نویسندگان
چکیده
Background: Determining the optimum shipment quantity in a traditional production system is competitive business dimension, and developing reliable policy decisive for long-term objectives. Currently, significant research this domain has mainly focused on lot sizing perfect without considering imperfections processes logistics. It been well established that real inventory acts as an imperfection overall management loop. Methods: This deals with designing new undertaking some influential factors, such transportation cost, actual inventory, defective items, backorders. Results: In developed mathematical framework, lot-sizing problems, processes, retailers, distributors are considered equal-sized to attain pragmatic real-time results. Conclusions: The framework considers all-unit-discount cost structure. numerical computations, sensitivity analysis, performed point out specifications validation of proposed model.
منابع مشابه
EPQ model with depreciation cost and process quality cost as continuous functions of time
Extensive research has been devoted to economic production quantity (EPQ) problem. However, little atten-tion has been paid to problems where depreciation cost and process quality cost must be considered, simulta-neously. In this paper, we consider the economic production quantity model of minimizing the annual total cost subject to depreciation cost and process quality cost, where depreciation...
متن کاملepq model with depreciation cost and process quality cost as continuous functions of time
extensive research has been devoted to economic production quantity (epq) problem. however, little atten-tion has been paid to problems where depreciation cost and process quality cost must be considered, simulta-neously. in this paper, we consider the economic production quantity model of minimizing the annual total cost subject to depreciation cost and process quality cost, where depreciation...
متن کاملDetermining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues
EPQ model; Replenishment lot size; Multiple deliveries; Random defective items; Production; Rework; Scrap items. Abstract This paper derives the optimal replenishment lot size and shipment policy for an Economic Production Quantity (EPQ) model with multiple deliveries and rework of random defective items. The classic EPQmodel assumes a continuous inventory issuing policy for satisfying demand a...
متن کاملModified Controllable Lead Time Model with Stochastic Demand and Batch Shipment Policy
This study investigates the single-vendor single-buyer integrated production inventory models with controllable lead time. The lead time demand is stochastic and shortage during the lead time is permitted. The buyer orders a lot of size Q and the vendor manufactures mQ with a finite production rate P at one set-up but ships in quantity Q to the buyer over m times. Most researchers do not take t...
متن کاملComputational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap
This paper employs mathematical modeling and algebraic approach to derive the optimal manufacturing batch size and number of shipment for a vendor-buyer integrated economic production quantity (EPQ) model with scrap. Unlike the conventional method by using differential calculus to determine replenishment lot size and optimal number of shipments for such an integrated system, this paper proposes...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Logistics
سال: 2022
ISSN: ['2305-6290']
DOI: https://doi.org/10.3390/logistics6030041