Design Genetic Algorithm To Find The Optimal Critical Path Network Project (GAOCPN)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Approach to find Total Float time and Critical Path in a fuzzy Project Network

The purpose of the critical path method (CPM) is to identify the critical activities in the critical path of an activity network. In the real world for many projects we have to use human judgment for estimating the duration of activities. However, the unknowns or vagueness about the time duration for activities in network planning, has led to the development of fuzzy CPM. A way to deal with thi...

متن کامل

Wireless sensor network design through genetic algorithm

In this paper, we study WSN design, as a multi-objective optimization problem using GA technique. We study the effects of GA parameters including population size, selection and crossover method and mutation probability on the design. Choosing suitable parameters is a trade-off between different network criteria and characteristics. Type of deployment, effect of network size, radio communication...

متن کامل

Optimal Path Diagnosis by Genetic Algorithm for NoCs

Nowadays Network-on-Chips is used instead of System-on-Chips for better performance. This paper presents a new algorithm to find a shorter path, and shows that genetic algorithm is a potential technique for solving routing problem for mesh topology in on-chip-network.

متن کامل

Fuzzy Critical Path Problem for Project Network

The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...

متن کامل

Aerodynamic Optimal Design of Wind Turbine Blades using Genetic Algorithm

Wind power has been widely considered and utilized in recent years as one of the most promising renewable energy sources. In the current research study, aerodynamic analysis of the upwind three-bladed horizontal axis turbine is carried out using blade element momentum theory (BEM), and a genetic algorithm (GA) is applied as an optimization method. Output power generation is considered as an obj...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: AL-Rafidain Journal of Computer Sciences and Mathematics

سال: 2012

ISSN: 2311-7990

DOI: 10.33899/csmj.2012.163696