Delay model for Engineering Procurement Construction (EPC): a case of Liquefied Natural Gas (LNG) projects in Indonesia

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Calculation of Liquefied Natural Gas (LNG) Burning Rates

A set of small-sized experiments were carried out at Texas A&M University's Brayton Fire Training Field (BFTF) to determine the radiative heat transfer of LNG pool fires. This set of experiments was designed to study how the heat feedback from the fire to the pool surface is subsequently distributed through the liquid volume. Burning rates of LNG pool fires are driven mainly by radiative heat t...

متن کامل

A comparative study of sloshing in liquefied natural gas (LNG) carriers according the classification codes

This paper assesses the design guidelines of different classification codes for the liquefied natural gas carriers considering the effect of liquid sloshing. With regard the increasing importance of LNG carriers in today’s marine transportation, and also considering that the marine accidents involve significant loss, classification societies by regulating national and international standards ai...

متن کامل

a comparative study of sloshing in liquefied natural gas (lng) carriers according the classification codes

this paper assesses the design guidelines of different classification codes for the liquefied natural gas carriers considering the effect of liquid sloshing. with regard the increasing importance of lng carriers in today’s marine transportation, and also considering that the marine accidents involve significant loss, classification societies by regulating national and international standards ai...

متن کامل

Methodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction

The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MATEC Web of Conferences

سال: 2019

ISSN: 2261-236X

DOI: 10.1051/matecconf/201927005010