Delay Analysis of anM/G/1/KPriority Queueing System with Push-out Scheme

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Research Article Delay Analysis of an M/G/1/K Priority Queueing System with Push-out Scheme

This paper considers an M/G/1/K queueing system with push-out scheme which is one of the loss priority controls at a multiplexer in communication networks. The loss probability for the model with push-out scheme has been analyzed, but the waiting times are not available for the model. Using a set of recursive equations, this paper derives the LaplaceStieltjes transforms (LSTs) of the waiting ti...

متن کامل

A push-pull queueing system

We consider a two node multiclass queueing network given by two machines each with two classes. There are two streams of jobs: One stream originates in machine 1, which feeds it for further processing to machine 2, and the other stream moves in the opposite direction. We describe a policy for this system which is stable and which keeps both machines busy at all times. We obtain explicit express...

متن کامل

Approximate Analysis of a Multi-Class Open Queueing Network with Class Blocking and Push-out

We study a multi-class queueing network which consists of a finite capacity node (node 0) linked to M parallel finite capacity nodes (nodes 1 to M). M classes of customers are assumed. All customers first join node O. A class i customer after completion of its service at node °always joins the ith node. All service times and inter-arrival times are assumed to be exponentially distributed. The s...

متن کامل

STABILITY ANALYSIS OF A PLANKTON SYSTEM WITH DELAY

This paper is evolved to have insight of Plankton-Nutrients interactions in the presence of delay in the growth term of phytoplankton species .The conditions for asymptotic stability about endemic equilibrium are derived in the absence of delay.The Nyquist criteria is used to estimate the length of delay to preserve stability .Analytic criterion for the existence of hopf-bifurcation is also dis...

متن کامل

Discrete Time Analysis of Multi-Server Queueing System with Multiple Working Vacations and Reneging of Customers‎

This paper analyzes a discrete-time $Geo/Geo/c$ queueing system with multiple working vacations and reneging in which customers arrive according to a geometric process. As soon as the system gets empty, the servers go to a working vacations all together. The service times during regular busy period, working vacation period and vacation times are assumed to be geometrically distributed. Customer...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2007

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2007/14504