Delay analysis of a discrete-time multiclass slot-bound priority system

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Delay analysis of a discrete-time multiclass slot-bound priority system

This paper introduces a new priority mechanism in discretetime queueing systems that compromises between first-come-first-served (FCFS) and head-of-line (HoL) priority. In this scheduling discipline which we dubbed slot-bound priority customers of different priority classes entering the system during the same time-slot are served in order of their respective priority class. Customers entering d...

متن کامل

Queue Content Analysis in a 2-Class Discrete-Time Queueing System under the Slot-Bound Priority Service Rule

The paper we present here introduces a new priority mechanism in discrete-time queueing systems. It is a milder form of priority when compared to HoL priority, but it favors customers of one type over the other when compared to regular FCFS. It also provides an answer to the starvation problem that occurs in HoL priority systems. In this new priority mechanism, customers of different priority c...

متن کامل

Delay Analysis of a Discrete-Time Non-Preemptive Priority Queue with Priority Jumps

In this paper, we consider a discrete-time non-preemptive priority queueing model with priority jumps. Two classes, real-time (high priority) and non-real time (low priority), of traffic will be considered with providing jumps from lower priority traffic to the queue of high priority traffic. We derive expressions for the joint probability generating function of the system contents of the high ...

متن کامل

MODELLING AND ANALYSIS OF A DISCRETE-TIME PRIORITY QUEUING COMPUTER NETWORK WITH PRIORITY JUMPS USING PROBABILITY GENERATING FUNCTIONS

Priority queues have a great importance in the study of computer communication networks in which different types of traffic require different quality of service standards. The discrete-time non-preemptive priority queuing model with priority jumps is proposed in this paper. On the basis of probability generating functions mean system contents and mean queuing delay characteristics are obtained....

متن کامل

Discrete-Time Analysis of MAP/PH/1 Multiclass General Preemptive Priority Queue

We use the matrix-geometric method to study the MAP/PH/1 general preemptive priority queue with a multiple class of jobs. A procedure for obtaining the block matrices representing the transition matrix P is presented. We show that the special upper triangular structure of the matrix R obtained by Miller [Computation of steady-state probabilities for M/M/1 priority queues, Oper Res 29(5) (1981),...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: 4OR

سال: 2011

ISSN: 1619-4500,1614-2411

DOI: 10.1007/s10288-011-0183-7