Cost Forecasting for Building Materials under Conditions of Uncertainty: Methodology and Practice
نویسندگان
چکیده
Most large construction projects face the problem of cost overruns and failures to meet deadlines mainly due changes in building materials. A lot studies proved high importance materials for project budget highlighted a number factors that determine However, modern unstable economic dynamics lead need not only observe sufficient accuracy quantity calculations regarding primary but also carefully predict cost, taking into account uncertainty (changes geopolitical situation, impact pandemic, technological structure, etc.). This article proposes use calculation expert methodology forecasting on example bars two regions Russian Federation. study includes review literature, which showed dependence prices materials, confirmed noneconomic risk uncertainty. Based literature review, it is concluded necessary expertly adjust results mathematical modeling materials’ price trend line under influence The statistics Russia were analyzed, main causes (economic noneconomic) identified. ARIMA model was selected build series reinforcement steel, an adjustment forecast made factors. method proposed, steel calculated its basis. In conclusion, this demonstrates algorithm practical conditions uncertainty, as well recommendations implementation predictive analytics tools practice.
منابع مشابه
Model identification for hydrological forecasting under uncertainty
Methods for the identification of models for hydrological forecasting have to consider the specific nature of these models and the uncertainties present in the modeling process. Current approaches fail to fully incorporate these two aspects. In this paper we review the nature of hydrological models and the consequences of this nature for the task of model identification. We then continue to dis...
متن کاملForecasting Under Structural Break Uncertainty
This paper proposes two new weighting schemes that average forecasts using different estimation windows to account for structural change. We let the weights reflect the probability of each time point being the most-recent break point, and we use the reversed ordered Cusum test statistics to capture this intuition. The second weighting method simply imposes heavier weights on those forecasts tha...
متن کاملDevelopment of closed-loop supply chain mathematical model (cost-benefit-environmental effects) under uncertainty conditions by approach of genetic algorithm
In the current world, the debate on the reinstatement and reuse of consumer prod-ucts has become particularly important. Since the supply chain of the closed loop is not only a forward flow but also a reverse one; therefore, companies creating integ-rity between direct and reverse supply chain are successful. The purpose of this study is to develop a new mathematical model for closed loop suppl...
متن کاملTeam Building under Pareto Uncertainty
This paper develops the team-building models under uncertainty of agents abilities described by Pareto distribution, and is organized as follows. At first, some properties of Pareto distribution required for further presentation are briefly discussed in Section 2. Then the solution of the team incentive problem is given in Section 3. Section 4 presents the team-building problem statement. Secti...
متن کاملa model for relief logistic under uncertainty conditions
for effective crisis management, appropriate telecommunications, which are required to fast response, are crucial. therefore, lack of existing proper telecommunications detract senior managers’ awareness about crisis conditions and also disturb rescuers in relief, causing increasing attendance time to the injured and fatalities. transfer point location problem is one of the new issues in the li...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Buildings
سال: 2023
ISSN: ['2075-5309']
DOI: https://doi.org/10.3390/buildings13092371