Cost benefit analysis of farm road improvement project-Calculation of internal rate of return, net present value and benefit ratio.

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Net Present Value versus Internal Rate of Return

Lajos Juhász Institute of Corporate Economics Faculty of Economics NET PRESENT VALUE VERSUS INTERNAL RATE OF RETURN University of West Hungary [email protected] ABSTRACT. The economic professional literature which deals with investment decisions can be characterised in general that the net present value shows objective picture for the decision maker while the internal rate of return – not...

متن کامل

Cost- Benefit Analysis of Gas to Liquids Project for the South-Pars Gas Field of Iran

This paper presents an economic evaluation of gas to liquids (GTL) project using “South-Pars” gas field of Iran based on the latest actual performing GTL projects. Iran has the world’s largest reserves of natural gas and can satisfy the projected long-term market demand of GTL products which have lower pollution and higher quality than refinery products. The results of cost-benefit analysis sho...

متن کامل

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

Cost-benefit analysis of road safety measures: applicability and controversies.

This paper discusses the applicability of cost-benefit analysis as an aid to policy making for road safety measures. A framework for assessing the applicability of cost-benefit analysis is developed. Five main types of criticism of cost-benefit analysis are identified: 1. rejecting the basic principles of cost-benefit analysis as not applicable to road safety, 2. excluding some types of issues ...

متن کامل

: the effect of sericin levels (silk glue protein) on rate of in vitro maturation, fertilization and culture of sheep oocytes

هدف از آزمایش اول بررسی اثر سطوح مختلف سریسین [0 (control), 0.1, 0.5, 1.0, 2.5 %] افزوده شده به محیط , ivm بر cumulus cell expansion، بلوغ هسته و توسعه متوالی جنین، در گوسفندان نژاد سنجابی در فصل تولید مثلی می باشد. از سرگیری میوز به وسیله خارج شدن اولین پولار بادی اندازه گیری و هم چنین درصد رسیدن جنین های دو سلولی به مرحله کلیواژ و بلاستوسیت نیز به عنوان نشانه ای از میزان شایستگی توسعه اولیه ج...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF RURAL PLANNING ASSOCIATION

سال: 2000

ISSN: 0912-9731,1881-2309

DOI: 10.2750/arp.19.19-suppl_61