Controlling Measures for Cost Overrun Causes in Highway Projects of Sindh Province

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

“ Causes of Non - Polio Acute Flaccid Paralysis in Children Residing in the Province of Sindh ”

OBJECTIVE: To determine the frequency of the causes of non-polio acute flaccid paralysis in the paediatric population of Sindh. STUDY DESIGN: descriptive/ cross sectional survey. SETTING: it is a community based study carried out in all the districts of the province of sindh from the year 2000 – 2009 METHODOLOGY: The study included all cases of acute flaccid paralysis (AFP) aged 0<15 years, res...

متن کامل

Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects

Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...

متن کامل

Public-Private Partnerships for Highway Projects

This document is embargoed until it is delivered at 10:00 a.m. (EST) on Wednesday, March 5, 2014. The contents may not be published, transmitted, or otherwise communicated by any print, broadcast, or electronic media before that time.

متن کامل

A probabilistic model of benefit-cost analysis for highway construction projects

He, Yue, "A probabilistic model of benefit-cost analysis for highway construction projects" (2015). Open Access Theses. 507. This is to certify that the thesis/dissertation prepared By Entitled For the degree of Is approved by the final examining committee: To the best of my knowledge and as understood by the student in the Thesis/Dissertation Agreement, Publication Delay, and Certification Dis...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering, Technology & Applied Science Research

سال: 2019

ISSN: 1792-8036,2241-4487

DOI: 10.48084/etasr.2749