CONSTRUCTION PROJECT DELIVERY IN A DEREGULATED ECONOMY

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Toward the construction knowledge economy : The e-cognos project

The paper focuses upon the contribution that knowledge management portals can make to the enhancement, development and improvement of professional expertise in the Construction domain. The paper is based on the e-COGNOS project which aims at specifying and developing an open model-based infrastructure and a set of tools that promote consistent knowledge management within collaborative construct...

متن کامل

Factors governing construction project delivery selection: A content analysis

Comprehensively identifying factors governing project delivery system (PDS) selection is crucial for construction projects. This paper aims at constructing a holistic system of governing factors. Based on review of previous studies, project condition factors and performance objective factors were identified to construct the factor system. To explore the perspective divergences, content analyses...

متن کامل

The KEES Project : Energy Efficiency in a Deregulated Market

The ISES Project – Information, Society, Energy, System – was started in 1996 and finished three years later, in 1998. The initial tasks for the project was to study in which way the fast expanding information technology would make energy distribution more efficient and at the same time create synergism with the growing information society by offering the electrical grid as a communication chan...

متن کامل

The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study

Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering Applied Sciences and Technology

سال: 2020

ISSN: 2455-2143

DOI: 10.33564/ijeast.2020.v05i01.009