A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملResource Leveling Using Petrinet and Memetic Approach
The problem of scheduling activities dynamic for a project, within the available resources and adhering to precedence relationships is NP hard combinatorial. Traditional approaches and their extensions are limited in application for simultaneous scheduling of resources with leveling. Considering the need for improved modeling and scheduling techniques, this paper proposes the use of Petrinet ba...
متن کاملUsing Hopfield to Solve Resource-Leveling Problem
Although the traditional permute matrix coming along with Hopfield is able to describe many common problems, it seems to have limitation in solving more complicated problem with more constrains, like resource leveling which is actually a NP problem. This paper tries to find a better solution for it by using neural network. In order to give the neural network description of resource leveling pro...
متن کاملResource Allocation and Resource Leveling in Heterogeneous SANET Environments
Actual research projects in the field of wireless communication systems focus on distributed, heterogeneous architectures for advanced Sensor-Actor-Networks (SANETs). Each subsystem provides specific capabilities for measuring or manipulating its environment. At the same time, a huge amount of sensor, status and control data has to be transmitted over different network interfaces and communicat...
متن کاملResource Leveling in Fuzzy Project Scheduling
In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Construction Division
سال: 1965
ISSN: 0569-7948,2690-2400
DOI: 10.1061/jcceaz.0000122