Chance-Constrained Outage Scheduling Using a Machine Learning Proxy

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chance-Constrained Outage Scheduling using a Machine Learning Proxy

Outage scheduling aims at defining, over a horizon of several months to years, when different components needing maintenance should be taken out of operation. Its objective is to minimize operation-cost expectation while satisfying reliabilityrelated constraints. We propose a distributed scenario-based chance-constrained optimization formulation for this problem. To tackle tractability issues a...

متن کامل

Real-time Scheduling of a Flexible Manufacturing System using a Two-phase Machine Learning Algorithm

The static and analytic scheduling approach is very difficult to follow and is not always applicable in real-time. Most of the scheduling algorithms are designed to be established in offline environment. However, we are challenged with three characteristics in real cases: First, problem data of jobs are not known in advance. Second, most of the shop’s parameters tend to be stochastic. Third, th...

متن کامل

SOME PROPERTIES FOR FUZZY CHANCE CONSTRAINED PROGRAMMING

Convexity theory and duality theory are important issues in math- ematical programming. Within the framework of credibility theory, this paper rst introduces the concept of convex fuzzy variables and some basic criteria. Furthermore, a convexity theorem for fuzzy chance constrained programming is proved by adding some convexity conditions on the objective and constraint functions. Finally,...

متن کامل

Chance-Constrained Scheduling via Conflict-Directed Risk Allocation

Temporal uncertainty in large-scale logistics forces one to trade off between lost efficiency through built-in slack and costly replanning when deadlines are missed. Due to the difficulty of reasoning about such likelihoods and consequences, a computational framework is needed to quantify and bound the risk of violating scheduling requirements. This work addresses the chance-constrained schedul...

متن کامل

Uncertain Chance-constrained Programming Model for Project Scheduling Problem

Project scheduling problem is to determine the schedule of allocating the loans to a project in order to balance the total cost and the completion time of the project under some constraints. This paper considers project scheduling problem in an uncertain environment, of which the duration time of each activity is an uncertain variable. Then uncertain chance-constrained programming model is cons...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Power Systems

سال: 2019

ISSN: 0885-8950,1558-0679

DOI: 10.1109/tpwrs.2018.2889237