Bored dinosaur skeletons

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Bored teenagers.

M ost of us have experienced that excruciating silence that often descends at the end of a scintillating seminar or even a symposium talk. We have invited a leading world expert to deliver a feisty lecture on the state-of-the-art and the ferment of ideas unleashed by their own findings. They have fulfilled the brief admirably, sticking zealously to the appointed 45-min time-slot, leaving ample ...

متن کامل

Bored-Hole Absorption Pits

BORED-HOLE ABSORPTION PITS By Rai Sahib KASHI PRASAD, m.b., b.s., d.p.h. Medical Officer, In-charge Health Unit, Parlabgarh Definition.?A bored-hole absorption pit is a hole 20 feet in depth and 16 inches in diameter, bored with a machine known as a boring outfit. A limited amount of sullage water is absorbed and disposed of by it every day. History.?Bored holes, which were originally introduce...

متن کامل

DIVERSION Bored to death ?

Have you ever felt bored (Fig 1)? Ever found yourself with nothing engaging to do? Experienced a lack of interest in everything and everyone around you? Although not a pleasant state in which to find oneself, is boredom bad for health? In a rare moment of idleness one day, we pondered whether the expression ‘bored to death’ has any basis. Are people who are bored more likely to die earlier than...

متن کامل

The Importance of Being... Bored

InnovatIvE DayDrEamIng Neuroscientists have been studying what the brain does when it isn’t doing anything in particular.1 Neuroimaging studies have found that the brain is surprisingly busy. In addition, the body is putting quite a bit of effort into that activity, as measured by a drop in blood flow of just 5–10 percent during periods of “rest.” Functional magnetic resonance imaging suggests ...

متن کامل

Simulation of Bored Pile Construction

The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both pili...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Journal of the Geological Society of Japan

سال: 2010

ISSN: 0016-7630,1349-9963

DOI: 10.5575/geosoc.116.1.i_ii