Assigning optimum time period for using evaporation cooling systems in Iraq
نویسندگان
چکیده
منابع مشابه
DETERMINATION OF OPTIMUM LOCATION FOR FLEXIBLE OUTRIGGER SYSTEMS IN NON-UNIFROM TALL BUILDINGS USING ENERGY METHOD
In this paper, based on maximizing the outrigger-belt truss system’s strain energy, a methodology for determining the optimum location of a flexible outrigger system is presented. Tall building structures with combined systems of framed tube, shear core, belt truss and outrigger system are modeled using continuum approach. In this approach, the framed tube sys...
متن کاملPeriod Selection for Minimal Hyper-period in Real-Time Systems
Task period and deadline selection are often used to adjust the workload to the available computational resources. This paper presents a method for adjusting the periods of the tasks which obtains the minimal hyper-period. Task periods are modelled as a range of possible periods. The selected periods are not constrained to be natural numbers, but can also be rational numbers. Without this limit...
متن کاملNew Strategies for Assigning Real-Time Tasks to Multiprocessor Systems
Optimal scheduling of real-time tasks on multiprocessor systems is known to be computationally intractable for large task sets. Any practical scheduling algorithm for assigning realtime tasks to a multiprocessor system presents a trade-off between its computational complexity and its performance. In this study, new schedulability conditions are presented for homogeneous multiprocessor systems w...
متن کاملSymbolic design of optimum discrete-time control systems using Mathematica
This work exploits the rich symbolic and programming capabilities ofMathematica for the design of discrete-time control systems with dead-beat response to polynomial timedomain inputs, with special focus on linear, time-invariant, single-input single-output systems, that are studied and described using the z-transform method. Mathematica notebooks are presented for the symbolic computation of g...
متن کاملOptimum Initial Billing Period
When a firm starts a new monthly customer account, they typically will bill new customers one month from the start of the new account. However, if they have the opportunity to choose the date of the first bill, this results in missing an opportunity for additional profit. This paper calculates the initial billing period that maximizes the net present value to the firm, and calculates the net ga...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied and Advanced Research
سال: 2018
ISSN: 2519-9412
DOI: 10.21839/jaar.2018.v3i6.241