Anti-noise measures at regional freight railway stations
نویسندگان
چکیده
منابع مشابه
Capacity utilisation and performance at railway stations
As traffic levels increase on railways in Britain and elsewhere, improved understanding of the trade-offs between capacity provision/utilisation and service quality is increasingly important, as Infrastructure Managers and Railway Undertakings seek to maximise capacity provision without an unacceptable loss of service reliability and punctuality. This is particularly true of the stations and ju...
متن کاملAnti-Malarial Measures in the Railway Area at Delhi
Medical officers in each local body were responsible for their respective areas. Fortnightly meetings of all the medical officers concerned were held at the Malaria Survey Office, Delhi, where Colonel Covell or Major Afridi, i.m.s. (special anti-malaria officer, Delhi), kept the medical officers fully posted with information about conditions prevailing in the various areas and about any danger ...
متن کاملScheduling railway freight cars
It is dif®cult to allocate the freight cars and to determine how to load the several varieties of goods into them. In order to improve ef®ciency, a knowledge-based system (KBS) is developed and integrated into the existing railway information system. This paper introduces the development of the system and the framework in which the KBS are integrated into the existing system environments. Under...
متن کاملAnti-Runaway Prevention System with Wireless Sensors for Intelligent Track Skates at Railway Stations
Anti-runaway prevention of rolling stocks at a railway station is essential in railway safety management. The traditional track skates for anti-runaway prevention of rolling stocks have some disadvantages since they are operated and monitored completely manually. This paper describes an anti-runaway prevention system (ARPS) based on intelligent track skates equipped with sensors and real-time m...
متن کاملSanitation and Other Allied Matters at Big Indian Railway Stations
2. Periodic flushing.?Do this by fire-hose pipes connected to the hydrants by a hydrantconnector. Dry the surface thoroughly with squeezers on the platforms and swabs in the waiting rooms, etc. 3. Collection of paper rubbish, fruit peels and skins.?-Do this in small waste-bins fixed at regular intervals' along the platform pillars. Banana skins lying on the platforms result nearly daily into pa...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Hygiena
سال: 2019
ISSN: 1802-6281,1803-1056
DOI: 10.21101/hygiena.a1722