An integrated design support method for flexible assembly systems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Design Support Methodology for Walking Worker Assembly Lines

A traditional assembly system-fixed worker line (FW) designed by assigning one operator to each workstation performing an assembly task at that workstation on the line, has some deficiencies, such as low flexibility, constant demand and difficult balancing. A walking-worker line (WW), with an assembly worker travelling with the work along the line, has several advantages over a traditional line...

متن کامل

Integrated support for systems design

This paper describes a design support system which goes beyond the support facilities offered by the current generation of CASE tools. We have examined the entire design process, and we propose that the early stages of conceptual design need a more flexible system than is currently offered by existing design methods. Our toollthe Designer's Notepad (DNp)) allorvs rough designs to be created and...

متن کامل

An approach for integrated design of flexible production systems

The paper presents a holistic methodological approach for designing flexible production systems, integrating the management of the production resources, operations planning, internal logistics and quality. The proposed methodology relies on lean principles and encompasses a series of stages and tools that may be used to design and to assess the robustness of the production system for tackling s...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

An economic analysis for integrated bi-objective biofuel supply chain design using support vector machine

Using second-generation biomass and biofuel deal with environmental pollution and CO2 emissions. Therefore, this paper design an integrated multi-period bi-objective biofuel supply chain network using support vector machine (SVM) and economic analysis to reduce the cost of generating biofuels and CO2 emissions. The economic analysis consists of three scenarios for supplyin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Manufacturing Systems

سال: 1996

ISSN: 0278-6125

DOI: 10.1016/0278-6125(96)84212-9