An Improved Heuristic for Single Machine Lot Scheduling Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a heuristic algorithm for solving single machine scheduling problem with periodic maintenance

in this paper, the scheduling problem with nonresumable jobs and maintenance process is considered in order to minimize the makespan under two alternative strategies. the first strategy is to implement the maintenance process on the machine after a predetermined time period and the second one is to consider the maximum number of jobs that can be done with a special tool. we have proposed a new ...

متن کامل

Three Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)

This paper proposes a mixed integer programming model for single-item capacitated lot-sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory capacity. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA), vibration damping optimization (VDO) and harmony search (HS) have been used to solve this model. Additionally, ...

متن کامل

A Price-Directed Heuristic for the Economic Lot Scheduling Problem

We formulate the well-known economic lot scheduling problem (ELSP) with sequence dependent setup times and costs as a semi-Markov decision process. Using an affine approximation of the bias function, we obtain a semi-infinite linear program determining a lower bound for the minimum average total cost rate. The solution of this problem is directly used in a price-directed dynamic heuristic to de...

متن کامل

An efficient meta-heuristic for the single machine common due date scheduling problem

A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...

متن کامل

An Exact and Meta-heuristic Approach for Two-agent Single-machine Scheduling Problem

In many real-life applications, it can be often found that multiple agents compete on the usage of a common processing resource in different application environments and different methodological fields, such as artificial intelligence, decision theory, operations research, etc. Moreover, scheduling with multiple agents is relatively unexplored. Based on this observation, this paper attempts to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.11.115