An improved exact algorithm for the domatic number problem
نویسندگان
چکیده
منابع مشابه
An Exact 2.9416n Algorithm for the Three Domatic Number Problem
The three domatic number problem asks whether a given undirected graph can be partitioned into at least three dominating sets, i.e., sets whose closed neighborhood equals the vertex set of the graph. Since this problem is NP-complete, no polynomial-time algorithm is known for it. The naive deterministic algorithm for this problem runs in time 3n, up to polynomial factors. In this paper, we desi...
متن کاملthe algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولAn Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملThe domatic number problem
A dominating set of a graph G =( P’, E) is a subset D of Vsuch that every vertex not in D is adjacent to some vertex in D. The domatic number d(G) of G is the maximum positive integer k such that V can be partitioned into k pairwise disjoint dominating sets. The purpose of this paper is to study the domatic numbers of graphs that are obtained from small graphs by performing graph operations, su...
متن کاملan exact algorithm for the mode identity project scheduling problem
in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Information Processing Letters
سال: 2007
ISSN: 0020-0190
DOI: 10.1016/j.ipl.2006.08.010