An Application on Flexible Job Shop Scheduling Problem with Iterated Greedy Algorithm
نویسندگان
چکیده
منابع مشابه
An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملTrain Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem
The present paper extends the idea of job shop scheduling problem with resting constraints to the train scheduling problem with the Muslim praying considerations. For this purpose, after proposing the new mathematical model, a heuristic algorithm based on the Electromagnetism-Like algorithm (EM) which is well adjusted to scheduling problems is employed to solve the large-size practical cases. T...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملGreedy Algorithm Solution of Flexible Flow Shop Scheduling Problem
Flexible flow shop scheduling problem (also called blended flow shop scheduling problem) is a sort of complex Job Shop Scheduling problem. For the Flexible Flow Shop scheduling problem, only in very special cases, there are polynomial optimal algorithms. In most of the other cases, the problems are NP-Hard. It is a simplification of the original problem to solve Flexible flow shop scheduling wi...
متن کاملAn iterated greedy metaheuristic for the blocking job shop scheduling problem
In this paper we consider a job shop scheduling problem with blocking (zero buffer) constraints. Blocking constraints model the absence of buffers, whereas in the traditional job shop scheduling model buffers have infinite capacity. There are two known variants of this problem, namely the blocking job shop scheduling (BJSS) with swap allowed and the BJSS with no-swap. A swap is needed when ther...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Institute of Science and Technology
سال: 2021
ISSN: 2146-0574
DOI: 10.21597/jist.785729