AHP AND WAFGP HYBRID MODEL FOR INFORMATION SYSTEM PROJECT SELECTION

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A case study for project and portfolio management information system selection: a group AHP-scoring model approach

Features variety, variations among organisations’ needs and the plethora of powerful project and portfolio management (PPM) information systems in the market, make the selection process among various PPM information systems a complicated process. The large number of the evaluation criteria involved during the decision aggravates the problem. This paper addresses the limitation of the number of ...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

Landfill Site Selection Using Geographic Information System and Fuzzy-AHP Model: A Case Study of Ilam Township, Iran

Introduction: Landfill siting is a difficult, complex, and protracted process, which requires evaluating different criteria. A suitable site should be located to dispose the municipal solid wastes hygienically (sanitary landfill), which is one of the fundamental subjects related to the environmental stability of the human settlements. The aim was to select a suitable waste disposal area using f...

متن کامل

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

Project Selection by Constrained Fuzzy AHP

The selection of a project among a set of possible alternatives is a difficult task decision makers have to face. Difficulties in selecting a project arise because of the different goals involved and because of the large number of attributes to consider. Our approach is based upon a fuzzy extension of the Analytic Hierarchy Process (AHP). This paper focuses on the constraints that have to be co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of the Analytic Hierarchy Process

سال: 2020

ISSN: 1936-6744

DOI: 10.13033/ijahp.v12i2.761