Adjusting effort estimation using micro-productivity profiles
نویسندگان
چکیده
منابع مشابه
Adjusting Effort Estimation Using Micro-Productivity Profiles
We investigate a phenomenon we call micro-productivity decrease, which is expected to be found in most development or maintenance projects and has a specific profile that depends on the project, the development model and the team. Micro-productivity decrease refers to the observation that the cumulative effort to implement a series of changes is larger than the effort that would be needed if we...
متن کاملQuantifying Productivity–Towards Development Effort Estimation in HPC
With increasing expenses for future HPC centers, the need to look at their productivity, defined as amount of science per total cost of ownership (TCO), grows. This includes development costs which arise from development effort spent to parallelize, tune or port an application to a certain architecture. Development effort estimation is popular in software engineering, but cannot be applied dire...
متن کاملExperimental Evaluation of Algorithmic Effort Estimation Models using Projects Clustering
One of the most important aspects of software project management is the estimation of cost and time required for running information system. Therefore, software managers try to carry estimation based on behavior, properties, and project restrictions. Software cost estimation refers to the process of development requirement prediction of software system. Various kinds of effort estimation patter...
متن کاملexperimental evaluation of algorithmic effort estimation models using projects clustering
one of the most important aspects of software project management is the estimation of cost and time required for running information system. therefore, software managers try to carry estimation based on behavior, properties, and project restrictions. software cost estimation refers to the process of development requirement prediction of software system. various kinds of effort estimation patter...
متن کاملTest Effort Estimation Using Neural Network
In software industry the major problem encountered during project scheduling is in deciding what proportion of the resources has allocated to the testing phase. In general it has been observed that about 40%-50% of the resources need to be allocated to the testing phase. However it is very difficult to predict the exact amount of effort required to be allocated to testing phase. As a result the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of the Estonian Academy of Sciences
سال: 2013
ISSN: 1736-6046
DOI: 10.3176/proc.2013.1.08