A simulated annealing approach to minimize the maximum lateness on uniform parallel machines

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A simulated annealing approach to minimize the maximum lateness on uniform parallel machines

This paper considers the uniform parallel machine scheduling problem which is to minimize the maximum lateness. This problem is equivalent to the uniform parallel machine scheduling problem, which is to minimize the maximal completion time of n jobs whose release times are zero, processing times depend on the speed of the machine to which they are assigned, and their delivery times are differen...

متن کامل

Scheduling on uniform parallel machines to minimize maximum lateness

We consider the uniform parallel machine scheduling problem with the objective of minimizing maximum lateness. We show that an extension of the EDD rule to a uniform parallel machine setting yields a maximum lateness value which does not exceed the optimal value by more than pmax, where pmax is the maximum job processing time. c © 2000 Elsevier Science B.V. All rights reserved.

متن کامل

Simulated Annealing Algorithm to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

This paper presents a simulated annealing algorithm to minimize makespan of single machine scheduling problem with uniform parallel machines. The single machine scheduling problem with uniform parallel machines consists of n jobs, each with single operation, which are to be scheduled on m parallel machines with different speeds. Since, this scheduling problem is a combinatorial problem; usage o...

متن کامل

Batch scheduling to minimize maximum lateness

We address the single-machine batch scheduling problem which arises when there are job families and setup requirements exist between these families; our objective is to minimize the maximum lateness. As our main result, we give an improved dynamic program for the solution of the problem. © 1997 Elsevier Science B.V. Kevwords: Analysis of algorithms; Dynamic programming; Production/scheduling

متن کامل

Minimizing Maximum Lateness on Identical Parallel Batch Processing Machines

We consider the problem of scheduling n jobs with release dates on m identical parallel batch processing machines so as to minimize the maximum lateness. Each batch processing machine can process up to B (B < n) jobs simultaneously as a batch, and the processing time of a batch is the largest processing time among the jobs in the batch. Jobs processed in the same batch start and complete at the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical and Computer Modelling

سال: 2011

ISSN: 0895-7177

DOI: 10.1016/j.mcm.2010.10.022