A proposed selection process in Over-The-Top project portfolio management

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

the impact of portfolio assessment on iranian efl students essay writing: a process-oriented approach

this study was conducted to investigate the impact of portfolio assessment as a process-oriented assessment mechanism on iranian efl students’ english writing and its subskills of focus, elaboration, organization, conventions, and vocabulary. out of ninety juniors majoring in english literature and translation at the university of isfahan, sixty one of them who were at the same level of writing...

15 صفحه اول

Proposed Feature Selection for Dynamic Thermal Management in Multicore Systems

Increasing the number of cores in order to the demand of more computing power has led to increasing the processor temperature of a multi-core system. One of the main approaches for reducing temperature is the dynamic thermal management techniques. These methods divided into two classes, reactive and proactive. Proactive methods manage the processor temperature, by forecasting the temperature be...

متن کامل

The Project Portfolio Management Problem

We consider the Project Portfolio Management Problem (PPMP) in which a limited resource must be allocated among a set of candidate projects over time so as to maximize expected net present value. We formulate this problem as a dynamic program but conclude that this approach is too computationally complex to be of value in supporting real-world project management. So, we investigate the structur...

متن کامل

Project Portfolio Risk Response Selection Using Bayesian Belief Networks

Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Engineering and Management

سال: 2018

ISSN: 2013-0953,2013-8423

DOI: 10.3926/jiem.2448