A Novel Large-Scale Stochastic Pushback Design Merged with a Minimum Cut Algorithm for Open Pit Mine Production Scheduling
نویسندگان
چکیده
Traditional optimization of open pit mine design is a crucial component mining endeavors and influenced by many variables. The critical factor in the geological uncertainty, which relates to ore grade. To deal with uncertainties related block economic values blocks general problem optimization, under unknown conditions, best ultimate limits pushback designs are produced minimum cut algorithm. push–relabel minimal algorithm provides framework for computationally efficient representation processing multiple scenarios. A sequential Gaussian simulation-based smoothing spline technique was created. produce pushbacks, an parameterized suggested. An analysis Indian iron performed. developed scheduling compared conventional algorithm, results show that when uncertainty considered, cumulative metal production higher there additional increase about 5% net present value. this work help industry plan mines such way can generate maximum profit from deposits.
منابع مشابه
A genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملA variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...
متن کاملA Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology
The Open Pit Mine Production Scheduling Problem (OPMPSP) studied in recent years is usually based on a single geological estimate of material to be excavated and processed over a number of decades. However techniques have now been developed to generate multiple stochastic geological estimates that more accurately describe the uncertain geology. While some attempts have been made to use such mul...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Systems
سال: 2022
ISSN: ['2079-8954']
DOI: https://doi.org/10.3390/systems10050159