A modified earned value management using activity based costing
نویسندگان
چکیده
منابع مشابه
Earned - Value Management Terminology
To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...
متن کاملPredicting project time and costs using earned value management based on trapezoidal fuzzy numbers
Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...
متن کاملValue-based Software Engineering: a Case Study Using Earned Value
plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value...
متن کاملA novel earned value management model using Z-number
The earned value management (EVM) model is an essential technique for managing and forecasting project features such as scheduling and cost performances indexes. This paper presents a novel fuzzy earned-value model based on Z-number theory incorporating both the impreciseness of real life conditions and a degree of reliability through considering an expert judgment process. The latter factor ha...
متن کاملValue Stream Costing using a New Theory: Technology Acceptance Model
Nowadays companies looking for increase of quality, flexibility and timeliness. One way to achieve these goals is lean thinking. To implementation lean production, companies are looking for waste reduction and Continuous improvement. This article Using the technology acceptance model (TAM) examined whether management accountants’ perceptions of the perceived ease of use (PEOU), or perceived use...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Project Management
سال: 2016
ISSN: 2371-8366,2371-8374
DOI: 10.5267/j.jpm.2017.3.002