A discrete group search optimizer for blocking flow shop multi-objective scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

Multi-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect

This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance.  First the problem is encoded with a...

متن کامل

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling

This paper proposes a Pareto-based grouping discrete harmony search algorithm (PGDHS) to solve the multi-objective flexible job shop scheduling problem (FJSP). Two objectives, namely the maximum completion time (makespan) and the mean of earliness and tardiness, are considered simultaneously. Firstly, two novel heuristics and several existing heuristics are employed to initialize the harmony me...

متن کامل

Genetic Algorithm with Selective Local Search for Multi-objective Permutation Flow Shop Scheduling Problem

In this paper the flow shop scheduling problem with minimizing two criteria simultaneously is consider. Selected criteria are: makespan and the sum of tardiness of jobs. For each separate criteria the problem is strongly NP-hard, which makes it NP-hard as well. There is a number of heuristic algorithms to solve the flow shop problem with various single objectives, but heuristics for multi-crite...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Mechanical Engineering

سال: 2016

ISSN: 1687-8140,1687-8140

DOI: 10.1177/1687814016664262