In shop scheduling, several applications exist where it is required that some components perform consecutively. We refer to no-idle schedules if machines are required to operate with no inserted idle time and no-wait schedules if tasks cannot wait between the end of an operation and the start of the following one. We consider here no-idle/no-wait shop scheduling problems with makespan as perfor...
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
heuristics are often used to provide solutions for flow shop scheduling problems.the performance of a heuristic is usually judged by comparing solutions and run times on test cases.this investigation proposes an analytical alternative ,called asymptotic convergence ,which tests the convergence of the heuristic to a lower bound as problem size grows. the test is a stronger variation of worst cas...
different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. conventional productionmethods are constantly subs...
This paper proposes a penalty-shift-insertion (PSI)-based algorithm for the no-wait flow shop scheduling problem to minimize total flow time. In the first phase, a penalty-based heuristic, derived from Vogel’s approximation method used for the classic transportation problem is used to generate an initial schedule. In the second phase, a known solution is improved using a forward shift heuristic...
We investigate the approximability of no-wait permutation flow shop scheduling problem under the makespan criterion. We present a polynomial time approximation scheme (PTAS) for problem on any fixed number of machines.
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...