نتایج جستجو برای: sized problem.
تعداد نتایج: 922679 فیلتر نتایج به سال:
in this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. we concern rework in the scheduling environment and propose a mixed-integer programming (mip) model for the problem. based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
This paper considers open-shop scheduling with no intermediate buffer to minimize total tardiness. This problem occurs in many production settings, in the plastic molding, chemical, and food processing industries. The paper mathematically formulates the problem by a mixed integer linear program. The problem can be optimally solved by the model. The paper also develops a novel metaheuristic base...
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
cell formation problem mainly address how machines should be grouped and parts be processed in cells. in dynamic environments, product mix and demand change in each period of the planning horizon. incorporating such assumption in the model increases flexibility of the system to meet customer’s requirements. in this model, to ensure the reliability of the system in presence of unreliable machine...
the aim of the present study was to determine the in?uence of presence or absence of corpus luteum (cl) on hormonal and metabolites composition of follicular ?uid (ff) harvested from different sized follicles and its relationship with blood serum concentrations in sanjabi ewes. ovaries and blood samples were collected from 60 clinically healthy adult ewes (sanjabi breed) 1–3 years of age in dio...
We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...
In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...
Cell formation problem mainly address how machines should be grouped and parts be processed in cells. In dynamic environments, product mix and demand change in each period of the planning horizon. Incorporating such assumption in the model increases flexibility of the system to meet customer’s requirements. In this model, to ensure the reliability of the system in presence of unreliable machine...
In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید