Mohammadreza Shahriari

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

The hub location problem is employed for many real applications, including delivery, airline and telecommunication systems and so on. This work investigates on hierarchical hub network in which a three-level network is developed. The central hubs are considered at the first level, at the second level, hubs are assumed which are allocated to central hubs and the remaining nodes are at the third ...

A new model and solution for the energy minimizing vehicle routing problem with time windows (EVRPTW) and customers’ priority is presented in this paper. In this paper unlike prior attempts to minimize cost by minimizing overall traveling distance, the model also incorporates energy minimizing which meets the latest requirements of green logistics. This paper includes the vehicles load as an ad...

This paper considers a multi-period, multi-product inventory-routing problem in a two-level supply chain consisting of a distributor and a set of customers. This problem is modeled with the aim of minimizing bi-objectives, namely the total system cost (including startup, distribution and maintenance costs) and risk-based transportation. Products are delivered to customers by some heterogeneous ...

Amin Ebrahim Bakhshipour, Ulrich Dittmer Yasaman Makaremi

The sewer layout in flat areas significantly influences the construction and operational costs as well as reliability of the network performance. To find an optimum design of sewer networks for flat areas, this study presents a multi-objective optimization problem with the objective functions of 1- the cost and 2- the reliability. The reliability criterion is defined as the effect of a clogging...

Journal: :international journal of industrial mathematics 2015
s. sedehzadeh‎ r. tavakkoli-‎moghaddam‎‎ f. jolai‎

one main group of a transportation network is a discrete hub covering problem that seeks to minimize the total transportation cost. this paper presents a multi-product and multi-mode hub covering model, in which the transportation time depends on travelling mode between each pair of hubs. indeed, the nature of products is considered different and hub capacity constraint is also applied. due to ...

Journal: :iranian journal of chemistry and chemical engineering (ijcce) 2009
ehsan samadani amir hossein shamekhi mohammad hassan behroozi reza chini

diesel engine emission standards are being more stringent as it gains more publicity in industry and transportation. hence, designers have to suggest new controlling strategies which result in small amounts of emissions and a reasonable fuel economy. to achieve such a target, multi-objective optimization methodology is a good approach inasmuch as several types of objective are minimized or maxi...

Journal: :international journal of supply and operations management 2015
abolfazl kazemi vahid khezrian mahsa oroojeni mohammad javad alireza alinezhad

in this study, a bi-objective model for integrated planning of production-distribution in a multi-level supply chain network with multiple product types and multi time periods is presented. the supply chain network including manufacturers, distribution centers, retailers and final customers is proposed. the proposed model minimizes the total supply chain costs and transforming time of products ...

F hosseinzadeh lotfi M.A Shafiiee M.R Shahriyary

The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...