نتایج جستجو برای: Train timetabling
تعداد نتایج: 43777 فیلتر نتایج به سال:
Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...
Train timetabling is a process of assigning suitable arrival and departure times to trains at the stations they visit and at key track junctions. It is desirable that the timetable focusses on passenger preferences and is operationally viable and profitable for the Train Operating Companies (TOCs). Many hard and soft constraints need to be considered relating to the track capacities, set of tra...
The aim of this paper is to analyze and to improve the current planning process of the passenger railway service in light of the recent railway market changes. In order to do so, we introduce the Passenger Centric Train Timetabling Problem. The originality of our approach is that we account for the passenger satisfaction in the design of the timetable. We consider both types of timetable(s): cy...
In a railroad system, train pathing is concerned with the assignment of trains to links and tracks, and train timetabling allocates time slots to trains. In this paper, we present an optimization heuristic to solve the train pathing and timetabling problem. This heuristic allows the dwell time of trains in a station or link to be dependent on the assigned tracks. It also allows the minimum clea...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید